The workers have been painting — and it’s looking amazing! Many of the light fixtures have been installed. And progress is being made on the other part of the building — where we’ll have the fellowship hall, kitchen, classrooms and more.
![DSC_0024 (1024x681)](https://i0.wp.com/www.lpcchapala.org/wp-content/uploads/2015/02/DSC_0024-1024x681.jpg?resize=600%2C399)
The pillars will all be a dark version of the yellow you see on the left.
![DSC_0007 (1024x681)](https://i0.wp.com/www.lpcchapala.org/wp-content/uploads/2015/02/DSC_0007-1024x681.jpg?resize=600%2C399)
Those beautiful doors on the right are to our handicapped access bathrooms
![DSC_0008 (1024x681)](https://i0.wp.com/www.lpcchapala.org/wp-content/uploads/2015/02/DSC_0008-1024x681.jpg?resize=600%2C399)
Looking into the sanctuary. (By the way, the gray concrete floors will be stained a different color soon.)
![DSC_0021 (1024x681)](https://i0.wp.com/www.lpcchapala.org/wp-content/uploads/2015/02/DSC_0021-1024x681.jpg?resize=600%2C399)
The sanctuary.
![DSC_0017 (1024x681)](https://i0.wp.com/www.lpcchapala.org/wp-content/uploads/2015/02/DSC_0017-1024x681.jpg?resize=600%2C399)
Foundation walls have been started in the back.
![DSC_0018 (1024x681)](https://i0.wp.com/www.lpcchapala.org/wp-content/uploads/2015/02/DSC_0018-1024x681.jpg?resize=600%2C399)
Everything you see here will be under the floor.